What Manufik does, in detail

Everything that happens in the warehouse and in production is recorded as a document. From those, Manufik works out the quantity on hand, the average cost and the production cost.

Goods receipt PR-2026-0042
PartQuantityLanded cost / pc
OPAMP-MCP601-IP100 pcs0.7631
LDO-LP2950-33LPRE3200 pcs0.3707
CAP-THT-TAN-4U7-16V300 pcs0.2617
Freight
11.60 EUR
Duty
7.34 EUR
Landed costs · allocated by value
18.94 EUR
An example goods receipt: landed costs allocated by the value of the lines.
Calculation of PCBA-LOGGER-02, per piece
Material
33.69 EUR
External services
4.80 EUR
Production overhead
3.37 EUR
Production cost
41.86 EUR
Labour
11.20 EUR
Machine
1.44 EUR
Calculation price
54.50 EUR

The production cost goes into the books. The calculation price is never posted — it is there so that a product is not sold for less than it cost.

An example calculation: two figures that are never added together.